Mr.Cullinan explains the use of a fid and how the tool is used in splicing.
The bottom has been power washed and painted with Interlux bottom paint.
The motor has been overhauled with a new batteries, solenoid, alternator, water pump impeller, and belt. The heat exchanger has been repaired and installed.
The Sea Scouts have helped along the way working on the boat, it is now ready for launch. Standby for actual pictures of the boat in the water.
Be sure to leave a comment!
2 comments:
Based on the photo, it looks like the engine needs to be removed for a complete overhaul. I suspect this engine has had many thousands of hours of use. I am sure the gearbox and shaft could use some TLC as well.
Thank you for the comment. Yes, we have had problems, over heating and with the gear box. Hopefully we have them all sorted out now and can look forward to a great boating season once the ice is off Lake Erie.
Post a Comment